Controlled roll-outWe onboard a few teams at a time. Join the waiting list to hold your place
Get started

Quickstart

From signing up to a draft pull request, in four steps.

This takes a few minutes. At the end you have a factory line on one repository and a task moving through it.

#Before you start

  • A repository on GitHub, GitLab, Bitbucket or Azure DevOps, and a personal access token that can clone it. For the full loop today, use GitHub: it is the host that sends issue and CI events.
  • For a Salesforce line, a login to the org: production, a sandbox, or an sfdx auth URL.
  • An account. The factory is in a controlled roll-out, so accounts are opened in groups: join the waiting list.

#Set up a line

  1. Name the workspace

    A workspace is what you own and the boundary every read is scoped to. Choose Salesforce as its platform. A system integrator creates one workspace per client.

  2. Connect

    Add the repository and the org. Connecting writes nothing to the repository and deploys nothing to the org. See Connect a repository and Connect a Salesforce org.

  3. Create a line

    A line is one board on one repository. It is created with working automations for all four stages, an intake label (factory by default), a Done rule and an attempt limit. You can change any of them later.

  4. Invite your team

    Add the people who will approve plans and review results. Members are not limited. You can skip this step and come back.

#Run a first task

Label an issue for the line. From a terminal:

terminal
gh issue create --label factory \
  --title "Close date can't be in the past for open opportunities" \
  --body "Sales users should not be able to save an open opportunity with a
close date before today. Admins with Sales_Admin can bypass.
Check: saving an open opp dated yesterday fails with a clear error."

Then follow it:

  1. The issue becomes a task in Backlog. Intake checks it is ready. If it isn't, it asks a question on the issue and waits.
  2. Press Start. The builder writes a plan and the task waits on your approval.
  3. Approve the plan. The agent builds in its agent-workspace and opens a draft pull request.
  4. Verify runs CI on the pushed commit, then a review. A failure goes back to Implement with the failing check attached.
  5. Done applies your rule: review requested, approved or merged.

Each stage change is reported as a comment on the issue, with the pull request link, so you can follow along without opening the board.

#Next steps